Project work is proceeding with cable splicing, testing, and inspection. Residents may see intermittent crew presence at manhole locations throughout the project route as these final stages are completed:
- Waite Street Substation (Salem)
- Manhole #2 (Salem, on Bridge Street)
- Manhole #3 (Beverly, on Congress Street, near the MBTA tracks)
- River Street Substation (Beverly)
- Manhole #6 (Beverly, near 35 Broadway)
- Manhole #7 (Beverly, near 2 Monument Square)
- Manhole #8 (Beverly, near 79 Hale Street)*
- Manhole #9 (Beverly, near 203 Lothrop Street)*
- Manhole #10 (Beverly, near 55 Cross Lane)*
- Manhole #11 (Beverly, near 100 Cross Lane)
- Boyles Street Substation (Beverly)
*Light work is scheduled at these locations for Sunday, April 6.
Work hours are 7:00 AM to 5:00 PM Monday through Friday, with some crews continuing work between 8:00 AM and 3:30 PM on Saturdays and/or Sundays as approved by the City of Beverly. Please let us know about any upcoming deliveries or special events that we can prepare to assist you with.
At times, work vehicles may need to stage outside of active worksites for traffic management purposes.
Please note that parking may be limited and/or through-traffic may be detoured on parts of the following streets in Beverly: Congress, Hale, East Lothrop, Monument Square, and Cross Lane. Residents will always be able to access their homes and driveways with assistance from police details, crew members, and traffic signage.
At times, construction equipment generates noise that will be noticeable to abutters. We thank you for your patience and understanding as we perform these critical infrastructure upgrades.
If you have questions, please feel free to contact a member of our project outreach team by emailing us at info@BeverlyRegionalTransmissionReliabilityProject.com or by calling our project hotline at (833) 238-4743.
**Please note, due to the complexities of underground construction, schedules are subject to change.